9th Street closures for crosswalk work

Next week, the construction of brick paver crosswalks on Camino del Mar will require intermittent closures of 9th Street. During the week of April 1, the east side of 9th Street will be inaccessible to through traffic at Camino del Mar; during the week of April 8, the west side of 9th Street will be inaccessible to through traffic at Camino del Mar. The road closures apply only to the immediate work area. Detour routes and pedestrian access to all businesses will be provided. 

Work near Board & Brew

Also next week, crews are scheduled to begin digging holes for tree planting near Board & Brew. Pedestrian traffic will not be impacted but noise and dust could affect customers on the front patio.


Blocks in Progress: 900, 1000 and 1100

Downtown Streetscape construction this week continued to concentrate on three blocks along the east side of Camino del Mar between 9th and 12th streets. Crews kept busy this week with retaining wall construction and pouring sidewalks.

The 900 Block

Finished sidewalks and pedestrian ramps at 9th Street
New sidewalks and pedestrian ramps were completed this week on the east side of the 900 block Camino del Mar.
900 Block rendering
A rendering of the 900 block.

The 1000 Block

1000 block curbing
Workers form curbing for a "bulb-out" on the southeast corner of the 1000 block.
1000 block rendering
A rendering of the 1000 block.

The 1100 Block

pedestrian ramp on the 1100 block
Workers build a pedestrian ramp and retaining wall at the southeast corner of the 1100 block.
new sidewalk at 12th street
A rendering of the 1100 block.



Streetscape in a nutshell

The Downtown Streetscape Project will beautify Camino del Mar and improve safety between 9th and Plaza streets. The $6.8 million project includes new sidewalks, crosswalks, bike lanes, street furniture, landscaping, paving and other improvements. Construction is scheduled to run through June. The Downtown Streetscape Project was first envisioned in 1996 as part of a citywide street and sidewalk improvement program.

Monday: Biweekly briefing, public welcome

Residents and business owners are invited to meet the project team and get the latest information on construction activity during biweekly briefings at the Del Mar Civic Center Town Hall, 1050 Camino del Mar. The next briefing is set for 9 a.m. Monday, April 1. Download a schedule (PDF)

Free parking at Civic Center

Visitors to downtown Del Mar can park for free at the Del Mar Civic Center, 1050 Camino Del Mar. The garage is accessible from entrances on 10th and 11th streets and by a stairway or elevator that connect to the plaza above.

traffic control devices

Safety is no accident

In construction areas, one of two lanes and parallel parking will be closed during work hours. Sidewalks could be closed temporarily. Please read and follow all posted signs. Do not cross orange fencing and stay clear of closed sidewalks. Thank you!


Estimated timeline

  • January through April: East side of Camino del Mar
  • April through June: West side of Camino del Mar
  • June: Camino del Mar medians and landscaping
  • June: Camino del Mar paving, striping and signage.