2016 Paving Project

The repair and reconstruction of roadways through the City of Del Mar is scheduled from November 2016 through January 2017.  The work consists of asphalt and concrete surface repairs on residential streets and alleys throughout the city. The City has contracted with PAL General Engineering, Inc. for the work. Dudek Engineering will provide Construction Management oversight.  Letters are being distributed to affected residents. 

Project Map (Map of the roads that will be repaired and reconstructed.)

The Construction Management Team will distribute door hangers and update the website 48 hours prior to road closures. During closures, residential access will typically be prohibited between 7:30 AM and 4:00 PM.  

The City requests cooperation in the following matters:

  • Please comply with posted parking restrictions. Vehicles parked in a posted “No Parking” area may be towed and will prolong the construction process.
  • Be aware that there will be limited access to the streets being worked on, and traffic detours will be present to accommodate resident needs.
  • Tools, materials, and equipment are attractive to children. For the safety of the children, please keep them away from the construction area.

We apologize for any inconvenience and appreciate your patience and understanding during this process.  Please contact Del Mar Public Works at 858-755-3294 with any questions.

 Traffic Control Plans for Project Areas

Click on the links below to view the Traffic Control Plans for the listed areas.

  • Detailed Traffic Control Plans of each work area are forthcoming.